— Advertisement —

Cascade: Mercer Island plan should ‘futureproof’ I-90 Trail, open house Monday

Concept images showing that the trail would remain its current width through the lid park with a two-foot soft buffer on each side. East of the town center, the trail would be 12 feet wide plus two-foot buffers on each side.
From the draft Aubrey Davis Park Master Plan (PDF)

When the I-90 Trail crosses Mercer Island, it climbs up and through a park created in the 1990s to cover the freeway. Posthumously named after and Island Councilmember and Mayor who negotiated with the state to include the lidded park, Aubrey Davis Park hides what would otherwise have been a freeway trench dividing the island from end-to-end.

Mercer Island is nearing the end of its master plan update for the park, which covers the lid park and the section of the trail east of the town center. Cascade Bicycle Club is urging people to support a “futureproof” I-90 Trail design that follows modern best practices for multi-use trails. You can show up to support the trail in-person at an open house 6–8 p.m. Monday at the Mercer Island Community & Events Center.

Specifically, Cascade is suggesting:


— Advertisement —

  • Right-size the I-90 Trail to fit local and national design standards, so that users experience a seamless trails network across jurisdictions. As national trails standards grow to 14 feet wide, King County is already building well-loved trails to 14 feet to give all users room to safely navigate.

  • Make sure this high-use section of trail supports more people (using more modes) to get around the regional trails network.

  • Support transit access and through-traffic on the trail as East Link Light Rail and increased bus service come online near the trail’s corridor.

Text: Aubrey Davis Park Master Plan Community Open House #3. Monday Sept 23 6 to 8 pm. Mercer Island Community & Events Center, 8236 SE 24th St, Mercer Island, WA 98040. Come provide input on the preferred Master Plan improvements. The City of Mercer Island and WSDOT are working together on a long term master plan for the future of Aubrey Davis Park. View proposed improvements that reflect community & city input. Let us know your thoughts and help define the future of Aubrey Davis Park! For ADA accommodations, please contact 206.275.7609 or MIParks@mercergov.org. Family-friendly open house! Kids activities and snacks will be provided.


About the author:


Related posts:

Comments

5 responses to “Cascade: Mercer Island plan should ‘futureproof’ I-90 Trail, open house Monday”

  1. Joan

    Imagine, if you will, an entire society designing itself around futureproof concepts

  2. slucommuter

    Those side-by-side images at the top of the post look identical. Are they supposed to be before/after? Is there some subtle difference I’m not seeing?

    1. Jeffrey Fisher

      I believe those are diagrams of ‘lidded area’ vs ‘east of that’. And the one of the left says “existing width” for the paved trail, while the ‘east of that’ says 12 feet. Perhaps not the most informative bit of the document. :)

      1. Jeffrey Fisher

        But relevant as Cascade is suggesting both of those would read 14′.

    2. Tom Fucoloro

      Yeah, I guess those concept diagrams are missing some context. Jeffrey is right. The master plan looks at the lid and east of the town center (the town center section is being left to the realm of light rail planning). The relevant info is that they aren’t planning to widen the trail through the park, and are planning 12’ for the east section. These widths aren’t awful or in critical need of immediate widening today, but a long term master plan should think big. For example, if some future construction project requires rebuilding the trail anyway, shouldn’t they rebuild it to modern standards?

— Advertisement —

Join the Seattle Bike Blog Supporters

As a supporter, you help power independent bike news in the Seattle area. Please consider supporting the site financially starting at $5 per month:


Latest stories

Bike Events Calendar

Jul
18
Thu
7:15 pm Point83 @ Westlake Park
Point83 @ Westlake Park
Jul 18 @ 7:15 pm
Point83 @ Westlake Park
Meet up in the center of the park at 7ish. Leave at 730. Every Thursday from now until forever rain or shine. Bikes, beers, illegal firepits, nachos, bottlerockets, timetraveling, lollygagging, mechanicals, good times.ShareMastodonTwitterFacebookRedditEmail
Jul
20
Sat
9:30 pm World Naked Bike Ride: Full Moon… @ Seattle Rep Parking Lot
World Naked Bike Ride: Full Moon… @ Seattle Rep Parking Lot
Jul 20 @ 9:30 pm
World Naked Bike Ride: Full Moon Ride @ Seattle Rep Parking Lot | Seattle | Washington | United States
Celebrate the Buck Moon by adorning your bicycle with blinky & twinkly lights. It’s the height of summer – warm nights and easy riding with friends. Saturday July 20 Parking Lot at Mercer St &[…]
Jul
25
Thu
7:15 pm Point83 @ Westlake Park
Point83 @ Westlake Park
Jul 25 @ 7:15 pm
Point83 @ Westlake Park
Meet up in the center of the park at 7ish. Leave at 730. Every Thursday from now until forever rain or shine. Bikes, beers, illegal firepits, nachos, bottlerockets, timetraveling, lollygagging, mechanicals, good times.ShareMastodonTwitterFacebookRedditEmail
Jul
27
Sat
all-day Bicycle Weekends on Lake Washing…
Bicycle Weekends on Lake Washing…
Jul 27 – Jul 28 all-day
Bicycle Weekends on Lake Washington Blvd
Details from Seattle Parks: On scheduled weekends from May to September, a portion of Lake Washington Boulevard will be closed to motorized vehicles from 10 a.m. Saturday to 6 p.m. Sunday. “Seattle Parks and Recreation[…]
Jul
28
Sun
all-day Bicycle Weekends on Lake Washing…
Bicycle Weekends on Lake Washing…
Jul 28 – Jul 29 all-day
Bicycle Weekends on Lake Washington Blvd
Details from Seattle Parks: On scheduled weekends from May to September, a portion of Lake Washington Boulevard will be closed to motorized vehicles from 10 a.m. Saturday to 6 p.m. Sunday. “Seattle Parks and Recreation[…]
— Advertisements —

Latest on Mastodon

Loading Mastodon feed…