— Advertisement —
  • Georgetown to South Park trail reaches design milestone, scheduled to open in 2023

    Drawing of people walking, rolling, biking and skateboarding between the two neighborhoods.
    Duwamish Valley Safe Streets created this cool image to promote the concept.

    The Georgetown to South Park Connection, a walking and biking trail concept promoted for years by the community-led group Duwamish Valley Safe Streets, is on schedule to begin construction in 2022 and open in 2023. Final design should be complete near the end of 2021.

    The path will lead from near 12th and Bailey in Georgetown to the South Park Bridge, connecting the two often neglected mixed industrial and residential neighborhoods. Walking and biking in the neighborhoods today is often stressful or dangerous because there are many wide, dangerous streets like E Marginal Way S. This trail will create a continuous and separated pathway for people to get between the two neighboring communities and business districts.

    Project map.The route follows 13th Ave S, S Albro Place, Ellis Ave S and S Myrtle Street before reaching a parcel of underutilized land owned by Seattle City Light. Called the “Flume Property” because it “was the historic site of the conveyance that transported water from the Duwamish River, to the Georgetown Steam Plant until it ended operation in 1975,” according to the project page for the park project. SDOT and Seattle Parks are partnering with City Light to turn it into a dog park and pathway, and City Light is paying for the environmental remediation required to make it a park. (more…)

    — Advertisement —
  • City delays Stone Way bike lane upgrade, latest of many Wallingford paving project safety cuts

    Side-by-side of the project maps from 2018 and 2021.
    Many safety improvements were cut since the project first took shape in 2018.

    Yes, the new bikeway around (half of) Green Lake is a big improvement. We made a whole video about it. But it is only one part of a major series of paving projects all grouped together into one very big “Green Lake and Wallingford Paving & Multi-Modal Improvements” project that aside from Green Lake Way has been almost entirely about cars.

    It didn’t start that way. But as the project developed, many biking and walking safety improvements were cut short or removed completely. Recent news that the city won’t move forward with the planned improvements and protected bike lanes on Stone Way from N 45th Street to N 50th Street is just the latest cut to the project’s bike improvements plan. “A change of funding availability due to the COVID-19 pandemic and other competing needs led to construction at this location being paused,” SDOT wrote in a project update.

    Initially, bike lanes were planned on N 40th Street as identified in the Bicycle Master Plan. The project was also going to make much needed improvements to the connection between the Burke-Gilman Trail and streets leading up the hill like 5th Ave NE. But then, as with 35th Ave NE, SDOT and Mayor Jenny Durkan did not stand by the goals of the bike plan and folded in the face of some complaints. So instead they repaved the whole street without making any significant safety improvements (beyond the accessible curb ramps they were legally required to update). In lieu of bike lanes, SDOT proposed a couple biking and walking safety “spot improvements” as a consolation prize for people hoping the busy east-west neighborhood street would become safer to navigate. These included improved crossings at Ashworth, Densmore, Bagley, 2nd Ave NE and Latona.

    But then as COVID-19 threw city budgets into question, SDOT cancelled the spot improvements. As a result, they simply repaved the street and prioritized car parking over safety.

    Photo of N 50th Street with the words "Seattle Car Master Plan" on it.
    In 2019, I used N 50th Street as the cover image for an imagined “Seattle Car Master Plan.”

    But at least most of 40th has a bus route that can benefit from the paving investment. That’s more than can be said for N 50th Street. I don’t understand how this street made it to the top of SDOT’s priority list for paving. It does not carry any bus routes, and the team did not even try to make any real safety improvements. There’s no equity benefit, no safety benefit, no transit benefit, and no neighborhood improvement benefit. They simply repaved a street through a neighborhood without making it any easier or safer to navigate. Unlike safety projects require years of planning and advocacy and long master plans with lengthy justifications, cars-first projects like N 50th Street don’t need to demonstrate any tie-in with the city’s stated goals. I wrote a slightly tongue-in-cheek argument back in 2019 arguing that the city needs a Car Master Plan, and I used N 50th Street for the imagined cover image:

    Without a Car Master Plan, many of Seattle’s biggest transportation investments are being spent without a clear focus on how these public projects will help us reach our major climate change, race and social justice, public health, housing growth, and high-level transportation goals. All of the other modal master plans take these issues seriously, but those master plan projects are the exception to the rule at SDOT. The default mode of operation is that every inch of road space should go to cars unless an existing master plan says otherwise. And even then, those plans are only considered suggestions that can be ignored.

    I’m particularly salty about this project because it’s near my house and I get angry every time I try to walk or bike along it or across it with my child because it’s terrifying. But there are streets exactly like this all over Seattle. The sidewalks are very skinny and right next to traffic, which is moving very quickly because there are multiple lanes in the same direction, a design SDOT knows is dangerous and leads to speeding. There are also long stretches without a safe crosswalk, which is frankly unethical for a transportation department to build. And after investing a lot of public money into this street, we still signs prohibiting people from crossing the street:

    A four-lane street with a "no walking" sign.
    Walking across SDOT’s brand new street is prohibited at 4th Ave NE near my home.
    SDOT presentation slide with an illustration of how multiple lanes in the same direction are dangerous for people in crosswalks.
    From an SDOT presentation about the NE 75th Street changes (same effect applies to N 50th Street). If the city knows this is dangerous, why didn’t they fix it when they repaved the street?

    This project either should have received a safety update or the budget should have gone somewhere else. The task of achieving Vision Zero is far too vast to be investing in dangerous street designs like this.

    And that brings us to the latest cut. SDOT just announced that they will not be repaving and redesigning Stone Way between 46th and 50th Streets due to “a change of funding availability due to the COVID-19 pandemic and other competing needs.” At least this time they are also cutting the paving project and not just the safety upgrades. But it’s more bike lane mileage that isn’t happening, adding to the city’s long list of bike plan cuts and delays. SDOT lists the work as “paused,” but there’s no timeline to resume.

    But let me put on my infinite optimist hat for a second. In addition to cutting the bike lanes, the city also will not make improvements to the awful 5-way intersection at Stone, Green Lake Way and 50th. Maybe this is actually an opportunity for Seattle’s next mayor to do something really great. Because that intersection needs a very bold change, and it’s very clear that Mayor Durkan is not up to such a challenge.

    Satelite map of the area around Green Lake Way between Aurora and Stone Way.
    Idea: Delete Green Lake Way N between Aurora and Stone Way.

    I gotta suggest my favorite idea, which comes from an old Seattle Bike Blog comment: Delete Green Lake Way between Aurora and Stone Way. The whole street, just gone. Then reconnect the neighborhood street grid and turn that awful 5-way intersection that absolutely everyone hates into a normal 4-way intersection. Do the same to the odd intersection with N 46th Street near Aurora. I am of course not a traffic engineer and don’t have the means to run all the traffic simulations and such, but I have a good feeling that this short diagonal street is causing a lot more traffic problems than it is solving. But I know for a fact it creates a lot of walkability and bikeability challenges. It’s so frustrating and stressful to cross, cutting off a lot of homes from easy access to neighborhood businesses, Woodland Park, and the nearby Rapidride E and Route 44 buses.

    What’s really great about this idea is that even after reconnecting the neighborhood street grid, the city will have a lot of new developable land. This could be turned into park space, affordable housing, or sold to fund the road redesign project (or some mixture of these ideas).

    This is all a long way of saying, We are getting a new mayor soon. We need a visionary leader who will stand up for our safety and climate goals and restore trust in SDOT’s ability to deliver on its promises. Rather than constantly looking for ways to scale back our city’s ambitions until they look like more of the same, our next mayor should challenge our city to think bigger and imagine a better world.

    — Advertisement —
  • Bad news for biking PNW travelers as BoltBus shuts down – UPDATED

    MAJOR UPDATE: After posting yesterday and sending a question to FlixBus, the company announced that “ALL FlixBuses operating in the PNW are planned to have 🚲 racks available beginning July 14th!”

    This is big news. FlixBus operates lines all over Washington and Oregon (and maybe to British Columbia when Canadian travel reopens?), even going places that BoltBus did not. Like Ellensburg, Spokane, Leavenworth and Wenatchee. For example, I can imagine FlixBusing to Ellensburg, then biking back to Seattle via the Palouse to Cascades Trail and camping along the way. This opens a lot of new opportunities for bike adventures.

    You have to register a spot for your bike when you buy your ticket. No spots are available on the website yet, but hopefully that will change in the next few weeks.

    https://twitter.com/FlixBus_USA/status/1410714073507852290

    Original post:

    A bicycle in front of a BoltBus.
    This old bike didn’t mind being shoved into the baggage compartment.

    BoltBus was wonderful for three reasons: It was cheap. It ran multiple times a day. And they would let you shove your bike in the baggage compartment for free.

    The bus service, owned by Greyhound, is apparently shutting down all its service across the continent, the Seattle Times reports. The official website says, “Effective 6/7/21 the BoltBus services are currently being operated by Greyhound in most markets while we undergo a few renovations.” But the Times reports that “Greyhound Lines, its parent company, has scuttled the BoltBus brand and has no plans to get it going again.”

    As just a bus service, it wasn’t too remarkable. Greyhound, Amtrak and FlixBus also travel to many of the same destinations. But its lax attitude about bringing bicycles is what made it an amazing way to travel between major Pacific Northwest cities on a very low budget. So not only did you save some bucks on transporting a bike, but you also didn’t have to pay for transportation when you got there.

    The Amtrak Cascades is still the best way to travel with your bike in the Pacific Northwest. They have bike storage in their baggage car, and you just have to pay a fee to reserve one of the spots. But the train schedule is limited, and tickets are a bit more expensive.

    If you want to bring a bike on a Greyhound bus, they make you box it up and charge you a significant oversize baggage fee. The hassle plus the fee essentially make it impractical to bring your bike on the Greyhound, especially if your plan was to bike to the bus, then hop on your bike to get around your destination. Bike boxes are big and unwieldy, and many people don’t know how to disassemble and reassemble their bikes quickly on a downtown sidewalk. It’s an impractical limitation that essentially makes Greyhound buses off-limits for bike travel unless it’s truly the only option.

    You can also take FlixBus, a service that sounds a lot like Boltbus and that even has an option you can check to bring a bike. The problem is that no trips seem to have an open bike space (suggesting that the Seattle-based buses don’t actually have bike racks). Former Mayor Mike McGinn and I had a Twitter exchange with FlixBus in 2019, and the company said it hoped to install bike racks on the Seattle-based buses in early 2020. But then, you know, some things happened that may have sidelined that work. Hopefully Flixbus does add those bike racks to the Seattle routes, because then it could be a great option. And since they also go to Ellensburg and Spokane, there are even more opportunities for FlixBus bike adventures.

    But there was something great about just shoving your bike into the baggage area of a Boltbus. Sure, it was hardly the tender loving care many might prefer, but there was no extra fee and no need to reserve a spot. Just bike up, shove it in, and go. Then straighten out your bent fender when you get to your destination, and bike away. Sometimes you just don’t need to overthink these things.

    Do you have a favorite way to travel to other big Pacific Northwest cities with a bike? Let us know in the comments below.

    — Advertisement —
  • Transit returns to full-capacity this week

    Transit is back. Over the next couple days, agencies around the region will relax many of their COVID precautions as the bulk of Washington State’s restrictions end.

    Like many of you, I’ve still been treating transit as an essential-trips-only service. I didn’t want to take a limited spot from someone who needed it more than I did. If biking was a practical option, I biked. I have taken the bus a handful of times, but it hasn’t been a regular part of my transportation mix like it was before the pandemic.

    But now I am vaccinated, and so are more than 70% of eligible King County residents. It’s time for transit to reopen to full capacity and regain its place as the go-to way to get around town (well, other than biking and walking of course).

    Riders will still have to wear masks and give the bus driver space (I mean, you should have been giving the bus driver space even before the pandemic), but the signs blocking off every other bus seat will be going away. Perhaps most importantly, buses will allow passengers until they reach normal capacity limits. This makes relying on transit much more practical for more people and more trips because it really sucks to get passed up by a full bus.

    Many lines are still operating at reduced service levels compared to 2019, so if you haven’t been taking the bus since the pandemic started, you may find that your every-7-minutes bus is now a 15-minute bus (or your 15-minute bus is now every 30 minutes). So check the schedule.

    I understand that many people probably still feel anxious about getting on a crowded bus. This has been a traumatic time, and feeling wary of crowds seems very natural. The good news it that studies have not found much evidence linking transit use with the spread of COVID even before vaccines. I hope these results hold as capacity increases, though the fact that the cities studied (like New York) have very high transit use gives me hope.

    Chart shows no correlation between increasing bus ridership and COVID cases in New York.
    Starting in mid-April, there is no apparent correlation between increasing bus ridership and COVID numbers in New York. Chart from “Public Transit and COVID-19 Pandemic: Global Research and Best Practices” by Sam Schwartz Consulting.

    (more…)

    — Advertisement —
  • Watch: Riding the new Green Lake bike lanes

    Before and after photos at Green Lake Way and Ravenna Boulevard..Crews are nearly finished upgrading one of the most important bike routes in Seattle. East Green Lake Way N may have a terribly confusing name, but it forms a hub of sorts for north end bike routes. The Interurban North regional bike route and routes from Greenwood, Northgate, Ravenna, the U District, Wallingford and Fremont all lead to Green Lake. It’s also among the few flat options in the area.

    I filmed a bike tour of the new lanes that walks through many of the changes and the history behind them. Watch above.

    Before the upgrade, the street had a skinny paint-only bike lane that disappeared in many places. Especially when the lake was busy, biking northbound could be a stressful experience as people would often drive across the bike lane to turn or park. And the worst was when people would swerve into the bike lane to pass a car waiting to make a left turn. The bike lane also completely or mostly disappeared at bigger intersections like Ravenna Boulevard, Green Lake Drive N and West Green Lake Way N.

    So when SDOT went to repave the street, they also fully reimagined how the bike route works. Three vital intersections got major remakes, and the northbound bike lane has shifted to the west side of the street to create a two-way bikeway. Though one-way bike lanes on either side of the street are typically preferred, this is a good example of an exception to that rule. Because the lake side of the street has far fewer driveways, placing both bike lanes on that side dramatically reduces the conflict points for people biking northbound. (more…)

    — Advertisement —
  • Watch: City Council candidates debate safe streets and transit

    Candidates for the open City Council Position 9 seat debated safe streets and other walking, biking and transit issues yesterday during a Move All Seattle Sustainably forum. Nikkita Oliver, Brianna Thomas and Sara Nelson attended. As with the recent mayoral forum, Erica C. Barnett moderated. Watch below (you can read the automated transcript with video time stamps here).

    The August 3 primary is coming up quickly, and ballots will be mailed July 14. If you have moved recently, the easiest way to vote is to register or change your address online ASAP so that your ballot is mailed to the correct place on July 14. The deadline to register or change your address online in King County is July 26, though you can register and vote in-person through Election Day.

    — Advertisement —
— Advertisement —

Join the Seattle Bike Blog Supporters

As a supporter, you help power independent bike news in the Seattle area. Please consider supporting the site financially starting at $5 per month:


Latest stories

Bike Events Calendar

Jul
25
Thu
7:15 pm Point83 @ Westlake Park
Point83 @ Westlake Park
Jul 25 @ 7:15 pm
Point83 @ Westlake Park
Meet up in the center of the park at 7ish. Leave at 730. Every Thursday from now until forever rain or shine. Bikes, beers, illegal firepits, nachos, bottlerockets, timetraveling, lollygagging, mechanicals, good times.ShareMastodonTwitterFacebookRedditEmail
Jul
27
Sat
all-day Bicycle Weekends on Lake Washing…
Bicycle Weekends on Lake Washing…
Jul 27 – Jul 28 all-day
Bicycle Weekends on Lake Washington Blvd
Details from Seattle Parks: On scheduled weekends from May to September, a portion of Lake Washington Boulevard will be closed to motorized vehicles from 10 a.m. Saturday to 6 p.m. Sunday. “Seattle Parks and Recreation[…]
Jul
28
Sun
all-day Bicycle Weekends on Lake Washing…
Bicycle Weekends on Lake Washing…
Jul 28 – Jul 29 all-day
Bicycle Weekends on Lake Washington Blvd
Details from Seattle Parks: On scheduled weekends from May to September, a portion of Lake Washington Boulevard will be closed to motorized vehicles from 10 a.m. Saturday to 6 p.m. Sunday. “Seattle Parks and Recreation[…]
Aug
1
Thu
7:15 pm Point83 @ Westlake Park
Point83 @ Westlake Park
Aug 1 @ 7:15 pm
Point83 @ Westlake Park
Meet up in the center of the park at 7ish. Leave at 730. Every Thursday from now until forever rain or shine. Bikes, beers, illegal firepits, nachos, bottlerockets, timetraveling, lollygagging, mechanicals, good times.ShareMastodonTwitterFacebookRedditEmail
Aug
8
Thu
7:15 pm Point83 @ Westlake Park
Point83 @ Westlake Park
Aug 8 @ 7:15 pm
Point83 @ Westlake Park
Meet up in the center of the park at 7ish. Leave at 730. Every Thursday from now until forever rain or shine. Bikes, beers, illegal firepits, nachos, bottlerockets, timetraveling, lollygagging, mechanicals, good times.ShareMastodonTwitterFacebookRedditEmail
— Advertisements —

Latest on Mastodon

Loading Mastodon feed…